Cordova Gold Mines Ltd Banner

Page headerFB Button
Mill exterior and stamps
Exterior showing some of the stamps
150 H P Corliss mill engine
Mill Engine, "150 H.P. Corliss"
The new 30-stamp mill is most excellent, and both the building and all the machinery and plant are models of their kind.

There seems to be no reason why the 30 stamps can not now be kept continuously at work and the supply of ore for them ought to be obtained without much trouble. The number of tons crushed per month ought, therefore, to exceed 2,000 or say 24,000 tons per annum.

At the present moment, using steam power, we may take, therefore, the cost of milling, milling, etc., at the above-mentioned figure, viz., $3.00 per ton.

«  Back to the Stamp Mill   |   On to the Assay Office  »

All Content courtesy: Ron Barrons
Website developed by: Jeri Danyleyko

Return to splash page